If the aircraft experiences a GEN failure, how does it maintain control?

Get more with Examzify Plus

Remove ads, unlock favorites, save progress, and access premium tools across devices.

FavoritesSave progressAd-free
From $9.99Learn more

Master the Tradewind Aviation Pilatus PC-12 NG Initial Check Test with our comprehensive study materials. Engage with flashcards and multiple choice questions, complete with detailed hints and explanations. Prepare efficiently for your certification exam!

In the event of a generator failure, the aircraft maintains control primarily through a bus tie connection. This system allows for the continuous distribution of electrical power by connecting different electrical busses within the aircraft. If the primary generator fails, the bus tie system can help to route power from the remaining functioning generator or from the battery to essential systems, ensuring that critical avionics and flight instruments remain operational.

In contrast, manual override, autopilot systems, or shutting down non-essential systems do not specifically address the challenge of maintaining electrical power and control systems integrity in the event of a GEN failure as effectively as the bus tie connection does. The bus tie serves as a critical redundancy feature that enhances the aircraft's reliability and safety.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy